The challenge

A compliance review of a GMP pilot plant found gaps in two places: the procedure operators follow when they gown, and the classification of the gowning rooms themselves. The final change rooms sat one grade below the zone they lead to, where EU GMP Annex 1 asks for the same grade at rest.

What we did

We reviewed the current gowning rooms and how operators move through them. On that basis we proposed a new layout for the area, with a dirty and a clean side in each room and hand washing before gowning, not after. The layout comes with a revised room classification and pressure cascade, and differential-pressure monitoring in every room.

Pressure cascade of the proposed gowning zone

  1. 0 PaCorridor, reference
  2. +15 PaGowning, Grade D
  3. Grade DProduction zone
Air is supplied on the clean side of each gowning room and extracted at low level on the dirty side.

The result

To help the client make an informed decision, we worked out two strategies:

  • Option A adapts the gowning rooms and keeps the impact on the existing air handling units to a minimum. It has the lower initial investment and works within the limits of the current installation.
  • Option B adapts the gowning rooms and makes larger changes to the existing air handling. The initial investment is higher, but the solution is more robust and leaves room for future changes.

The client received both options, a budget estimate and the open points, named plainly.